AURORVIX
Industrial weighing · project-sourced RFQ

Heavy M1 test weights quoted around source, handling and calibration requirements.

Aurorvix handles 500 kg, 1000 kg and 2000 kg M1 heavy test weights as a project-sourced line. Unlike the three documented manufacturing-partner lines, no permanent factory is claimed here before quotation: the manufacturing source, final design, handling configuration, calibration route and logistics are confirmed for the individual project.

500 kg1000 kg2000 kgProject-sourced source confirmed per quotation
1000KG · HEAVY TEST WEIGHT500 / 1000 / 2000 kg project configurations · final design confirmed before order.
Source status

Project-sourced, not presented as a fixed manufacturing-partner line.

Aurorvix does not currently publish a permanent manufacturing partner for heavy test weights. Supplier identity, factory evidence, final drawing, tolerance / calibration basis and certificate route are confirmed for the specific quotation before an order is treated as confirmed.

Project configuration

Handling, adjustment and calibration requirements are confirmed together.

This is treated as an industrial project item rather than a consumer SKU. Final drawing and documentation are agreed before order.

HANDLING

Lifting points

Lifting-point configuration is available as a project option and must be confirmed against the final design.

HANDLING

Forklift pockets

Forklift handling can be specified where required for site movement and test operations.

ADJUSTMENT

Adjustment chamber

Adjustment-chamber requirements can be discussed for the final project configuration.

Manufacturing sourceProject-sourced · confirmed in quotationSupplier identity and applicable source evidence are confirmed before order.
Nominal mass500 kg / 1000 kg / 2000 kgCurrent documented project sizes.
ClassM1 project scopeFinal tolerance and calibration basis must be confirmed for the order.
HandlingLifting points / forklift pocketsConfiguration is selected around site handling requirements.
AdjustmentAdjustment chamber optionConfirmed against the final design.
CalibrationDocumentation available by projectRequired certificate type and issuing route must be agreed before quotation.
01 · Required mass02 · Quantity03 · Calibration-document requirement04 · Crane / forklift handling05 · Destination country / port06 · Any drawing or custom design requirement
Quotation check

Final tolerance, finish, calibration documentation, lifting arrangement and logistics are confirmed in the project quotation rather than assumed from the nominal mass alone.

Send mass, quantity and destination.

Add calibration-document requirements and preferred handling features where known.

WhatsApp